INFRASTRUCTURE
History
19
99
1999

Haat Incinerators was formed after breaking off from another engineering company to enable focus on core environmental solutions through incineration.

20
04
2004

At the behest of some large industries and regulatory authorities, who felt an incinerator OEM will be better at operating and maintaining a common hazardous waste incineration facility, we set up our plant this year and operations were on a fairly small scale, primarily as we believe that our growth should simultaneously ensure protection of the Environment, Health & Safety.

20
06
2006

Haat ties up with CTU, Switzerland to bring in Swiss technology to our clients.

20
08
2008

Haat's facility undergoes 1st upgrade to replace 1 primary chamber with a new system capable of handling various types of waste through feeding systems.

20
10
2010

2nd upgrade to increase scrubber capacity and for cooling of recirculation water for round the clock operation.

20
17
2017

4th upgrade to make the system fully automatic and Euro emission norms compliant by a combination of a bag filter and acid gas scrubbing. An online emission monitoring system interlocked to CPCB's server also installed (German make). With this, all prior operator caused problems are eliminated as intense cause and effect studies have been done and interlocks programmed. Big increase in instrumentation including emergency shut down actions. 2 ID fans provided for higher equipment uptime.

Contact

91-(0)8110-416666

hse@haat-india.com

Location

Haat Incinerators India Pvt Ltd,

35 B&C, Jigani Industrial Area,

Bengaluru - 560 105,

India.

Social Media